New gas field opened up

Dosch is supplying venturi tubes to Indonesia for MAN Energy Solutions

A new gas field was discovered on the coast of Indonesia in 2002. As a conventional gas project, the field, which is called Unitized Jambaran-Tiung Biru (JTB), promises annual yields of around 2,665 bpd crude oil and condensate as well as 192 million m³ natural gas. Until then, the development of the gas field had necessitated the sinking of around six boreholes. The Unitized Jambaran-Tiung Biru (JTB) project became operational in 2022 and, based on commercial assumptions, is set to reach its economic limit in 2047.

 

Dosch has supplied the project leader, MAN Energy Solutions, with venturi tubes with an order volume in excess of €250,000.00 for the Unitized Jambaran-Tiung Biru (JTB) project.